Home
About
At a Glance
Strategy
Why working with EICW?
Timeline
Our Team
Policies and Certifications
Our Works
Road Pavement Works
Construction of Airport runways and Aprons
Railroad Embankment
Production of Pre-stressed Concrete Sleepers
Building Construction
Infrastructure Networks and Utilities
Vehicle Bridges
Projects
Contact
Downloads
Home
About
At a Glance
Strategy
Why working with EICW?
Timeline
Our Team
Policies and Certifications
Our Works
Road Pavement Works
Construction of Airport runways and Aprons
Railroad Embankment
Production of Pre-stressed Concrete Sleepers
Building Construction
Infrastructure Networks and Utilities
Vehicle Bridges
Projects
Contact
Downloads
Timeline2020
EICW Timeline
2023
2023
Construction of EICW Factory producing RFI-260 Sleeper, Giza
2022
2022
Earthworks and Lining for Construction of Main and Secondary Canals andIndustrial Structures for Development of Southern Valley, Toshki region
2021
2021
Construction of Qahafa Water Treatment Station, Fayoum
2020
2020 – 2022
Upgrade, Rehabilitation, Electro-mechanical Works, and Finishes forBuildings Nos. (1) and (5) at the National Academy for Training (NAT)
2020
2020
Upgrade of Routes Leading to Passenger Hall No. 3, Cairo InternationalAirport
2020
2020
Runway Rehabilitation and Irish Sections, Al-Areesh Airbase
2019
2019
Airside Rigid Pavement Works and Protection Works against Flash Floods,Berniss Airbase
2018
2018 – 2022
Construction of 16 Nos. Residential Buildings in Zone (R1), at the New Administrative Capital
2018
2018
Construction Works for the Japanese Egyptian School in Ismailia
2017
2017
Rigid Pavement Works at El-Salheya Airbase
2016
2016
First Vehicle Bridge Works assigned to EICW: 2 Bridges on Cairo-SuezDesert Road
2015
2015
Runway at Hurghada International Airport
2015
2015
First Rigid Pavement Works: Airside Concrete Slabs for Military andCommercial Aprons at El-Meliz Airport
2009
2009 – 2013
Abu-Simbel Waste Treatment Plant Contract
2007
2007 – 2010
Infrastructure Works and Flexible Pavement Works in New Heliopolis City
2005
2005
Flexible (Asphalt) Pavement Works for Sokhna Industrial Zone.
2003
2003 – 2004
Flexible (Asphalt) Pavement Works at Hurghada International Airport
2000
2000
First Infra-structure and Utility Works assigned to EICW
1997
1997
First Flexible (Asphalt) Pavement Works and Civil Works assigned to EICW
1996
1996
EICW Establishment
Scroll to top
Send to Email Address
Your Name
Your Email Address
Close