Milestones on EICW Time Line

2024,EICW becomes a Limited Liability Company

EICW becomes a Limited Liability Company

2023,Construction of EICW Factory producing RFI-260 Sleeper, Giza

Construction of EICW Factory producing RFI-260 Sleeper, Giza

2022,Earthworks and Lining for Construction of Main and Secondary Canals and Industrial Structures for Development of Southern Valley, Toshki region

Earthworks and Lining for Construction of Main and Secondary Canals and Industrial Structures for Development of Southern Valley, Toshki region

2021,Construction of Qahafa Water Treatment Station, Fayoum

Construction of Qahafa Water Treatment Station, Fayoum

2020-2022,Upgrade, Rehabilitation, Electro-mechanical Works, and Finishes for Buildings Nos. (1) and (5) at the National Academy for Training (NAT)

Upgrade, Rehabilitation, Electro-mechanical Works, and Finishes for Buildings Nos. (1) and (5) at the National Academy for Training (NAT)

2020,Upgrade of Routes Leading to Passenger Hall No. 3, Cairo International Airport

Upgrade of Routes Leading to Passenger Hall No. 3, Cairo International Airport

2020,Runway Rehabilitation and Irish Sections, Al-Areesh Airbase

Runway Rehabilitation and Irish Sections, Al-Areesh Airbase

2019,Airside Rigid Pavement Works and Protection Works against Flash Floods, Berniss Airbase

2019,Airside Rigid Pavement Works and Protection Works against Flash Floods, Berniss Airbase

2018 – 2022,Construction of 16 Nos. Residential Buildings in Zone (R1), at the New Administrative Capital

Construction of 16 Nos. Residential Buildings in Zone (R1), at the New Administrative Capital

2018,Construction Works for the Japanese Egyptian School in Ismailia

Construction Works for the Japanese Egyptian School in Ismailia

2017,Rigid Pavement Works at El-Salheya Airbase

Rigid Pavement Works at El-Salheya Airbase

2016,First Vehicle Bridge Works assigned to EICW: 2 Bridges on Cairo-Suez Desert Road

First Vehicle Bridge Works assigned to EICW: 2 Bridges on Cairo-Suez Desert Road

2015,Runway at Hurghada International Airport

Runway at Hurghada International Airport

2009 – 2013 , Abu-Simbel Waste Treatment Plant Contract

Abu-Simbel Waste Treatment Plant Contract

2007 – 2010,Infrastructure Works and Flexible Pavement Works in New Heliopolis City

Infrastructure Works and Flexible Pavement Works in New Heliopolis City

2005,Flexible (Asphalt) Pavement Works for Sokhna Industrial Zone.

Flexible (Asphalt) Pavement Works for Sokhna Industrial Zone.

2003 – 2004,Flexible (Asphalt) Pavement Works at Hurghada International Airport

Flexible (Asphalt) Pavement Works at Hurghada International Airport

2000,First Infra-structure and Utility Works assigned to EICW

First Infra-structure and Utility Works assigned to EICW

1997,First Flexible (Asphalt) Pavement Works and Civil Works assigned to EICW

First Flexible (Asphalt) Pavement Works and Civil Works assigned to EICW

1996,EICW Establishment

EICW Establishment

Scroll to top