Timeline

EICW Timeline

2023

Construction of EICW Factory producing RFI-260 Sleeper, Giza

2022

Earthworks and Lining for Construction of Main and Secondary Canals andIndustrial Structures for Development of Southern Valley, Toshki region

2021

Construction of Qahafa Water Treatment Station, Fayoum

2020 – 2022

Upgrade, Rehabilitation, Electro-mechanical Works, and Finishes forBuildings Nos. (1) and (5) at the National Academy for Training (NAT)

2020

Upgrade of Routes Leading to Passenger Hall No. 3, Cairo InternationalAirport

2020

Runway Rehabilitation and Irish Sections, Al-Areesh Airbase

2019

Airside Rigid Pavement Works and Protection Works against Flash Floods,Berniss Airbase

2018 – 2022

Construction of 16 Nos. Residential Buildings in Zone (R1), at the New Administrative Capital

2018

Construction Works for the Japanese Egyptian School in Ismailia

2017

Rigid Pavement Works at El-Salheya Airbase

2016

First Vehicle Bridge Works assigned to EICW: 2 Bridges on Cairo-SuezDesert Road

2015

Runway at Hurghada International Airport

2015

First Rigid Pavement Works: Airside Concrete Slabs for Military andCommercial Aprons at El-Meliz Airport

2009 – 2013

Abu-Simbel Waste Treatment Plant Contract

2007 – 2010

Infrastructure Works and Flexible Pavement Works in New Heliopolis City

2005

Flexible (Asphalt) Pavement Works for Sokhna Industrial Zone.

2003 – 2004

Flexible (Asphalt) Pavement Works at Hurghada International Airport

2000

First Infra-structure and Utility Works assigned to EICW

1997

First Flexible (Asphalt) Pavement Works and Civil Works assigned to EICW

1996

EICW Establishment