Road Pavement Works

Flexible (Asphalt) Paving

Since its start in 1996, EICW was awarded more than 50 contracts to implement flexible paving works that include:

  1. Scraping old asphalt (if required);
  2. All necessary earthworks;
  3. Sub-grade, sub-base, and base layers;
  4. Pavement layers (prime-coat layer; binder course, tack coat, and surface asphaltic course);
  5. Road marking.

Rigid (Concrete) Paving

EICW started implementing rigid paving works for roads in 2020. Implementing rigid paving works include:

  1. Demolition of old concrete (if required);
  2. All necessary earthworks;
  3. Sub-grade, sub-base, and base layers;
  4. On-grade concrete slabs;
  5. Concrete/ concrete joints;
  6. Concrete/ asphalt joints;
  7. Road marking.